Maggie’s Nottingham Building
- Project Name: Maggie’s Nottingham Building
- Construction year: 2011
- Architect(s): CZWG
- Project Category:
- Website: www.maggiescentres.org/centres/nottingham/introduction
- Address: Nottingham City Hospital Campus, Hucknall Road Nottingham, NG5 1PB, NOTTINGHAM, United Kingdom
- Latitude: 52.9889
- Longitude: -1.15929
CZWG was commissioned by Maggie’s to design a new cancer care centre in Nottingham to serve the East Midlands Cancer Network. It is set on a wooded slope in the grounds of Nottingham City Hospital Campus, between the Oncology Department and the Breast Unit.
The two story building ‘floats’ above the ground on a semi basement and is accessed by a wide bridge from up the slope. It is visibly part of the hospital but lifted up protectively amongst the trees.
The green glazed oval elevation with their overlapping corners front economical square plans in which the many rooms required flow from one to another. The section exploits the curved roof and soffit to provide different height rooms and spaces. They have been richly furnished to the design of Sir Paul Smith, a famous son of Nottingham. Large balconies extend the rooms out within touching distance of the tree canopies.
How to get there
Information
Contract duration: 11 months
Completion: Oct 2011
Construction Cost: £1.45m
Cost per m²: £4000
Area: 360 m² (144 m² on each of two floors above a 72m² basement)
Contract Type: Traditional
Interior Design: Paul Smith (Interiors)
Structural engineer: Adams Kara Taylor
M&E consultant: KJ Tait Engineers
Quantity surveyor: Turner & Townsend
Lighting Consultant: FOTO-MA
Landscape Architect: envert studio
Project manager: Turner & Townsend
Main contractor: Bowmer and Kirkland Building Services
CDM coordinator: PFB Construction Management Services
Approved building inspector: MLM Building Control
Photos: Martine Hamilton Knight
Found incorrect or incomplete information on the project? Tell us.
Do you have better photos? Send to email
-
ATHENS HEART DESIGN AWARD – Competition is now OPEN!
28/05/2013 -
Tlacolula Social Housing / Dellekamp Arquitectos
25/05/2013 -
Amsterdam 307 / Dellekamp Arquitectos
25/05/2013 -
NDBS / Atelier Zündel Cristea
25/05/2013 -
Arena Stadium 92 / Atelier Zündel Cristea
21/05/2013
-
The Landmark Tower
01/01/2013 -
Corporate Office of Apollo Tyres
01/05/2013 -
Burj Khalifa
01/01/2013 -
Chilehaus
02/01/2013 -
Tama Art University Library (Hachioji campus)
01/01/2013
-
Kirkpatrick Oil Hennessey
14/06/2013 -
Chesapeake Child Development Center
12/06/2013 -
Chesapeake Car Park One
11/06/2013 -
Private Clinic in Champigny
28/05/2013 -
ZCBB3
28/05/2013



